主持人 | 計畫名稱 | 贊助單位 | 執行期間 |
陳建良 | 無人搬運車系統規劃與評估 Planning and Analysis of Automated Guided Vehicle Systems | 國科會 NSTC | 2024.06 - 2025.05 |
以精實再造提升生產力 Improving Productivity with Lean Reengineering | 國科會 NSTC | 2023.11 - 2024.10 | |
精實智慧製造:智慧儀錶板 Lean and Smart Manufacturing: Intelligent Dashboard | 國科會 NSTC | 2022.11 - 2023.10 | |
精實智慧製造:KPI分析與應用 Lean Smart Manufacturing: KPI Analysis and Application | 國科會 NSTC | 2022.08 - 2025.07 | |
以精實再造消除浪費提升生產力 Productivity Improvement Using Lean Reengineering with Waste Elimination | 科技部 Ministry of Science and Technology | 2021.11 - 2022.10 | |
精實生產跨產業應用 Lean Production Applications Crossing Industries | 科技部 Ministry of Science and Technology | 2021.08 - 2022.07 | |
以精實生產提升競爭力 Improving Competitiveness with Lean Production | 科技部 Ministry of Science and Technology | 2021.06 - 2022.05 | |
最終測試產能規劃 Capacity Planning for Final Test | 科技部 Ministry of Science and Technology | 2020.11 - 2021.10 | |
應用精實管理提升生產力 Productivity Improvement by Applying Lean Management | 科技部 Ministry of Science and Technology | 2020.06 - 2021.05 | |
以精實再造提升生產力 Improving Productivity with Lean Reengineering | 科技部 Ministry of Science and Technology | 2019.11 - 2020.10 | |
以精實管理與智慧製造提升生產力與競爭力 Improving Productivity and Competiveness Through Lean Management and Smart Manufacturing | 國立清華大學國際產學聯盟 NTHU GLORIA | 2019.09 - 2020.12 | |
加工中心網頁排程系統研發 (2/2) Development of Web-Based Scheduling System for Machining Center | 科技部 Ministry of Science and Technology | 2019.06 - 2020.05 | |
應用資訊技術於智慧養殖 Application of Information Technology in Smart Aquaculture | 北京清華大學 Tsing Hua University (Beijing) | 2019.01 - 2020.12 | |
以精實管理提升生產力 Productivity Improvement Using Lean Management | 科技部 Ministry of Science and Technology | 2018.11 - 2019.10 | |
精實生產與應用 (1/3) Lean Production and Application | 科技部 Ministry of Science and Technology | 2018.08 - 2021.07 | |
加工中心網頁排程系統研發 (1/2) Development of Web-Based Scheduling System for Machining Center | 科技部 Ministry of Science and Technology | 2018.06 - 2019.05 | |
精實管理教學實踐 Teaching and Practice of Lean Management | 教育部 Ministry of Education | 2018.06 - 2019.05 | |
卓越製鞋模擬分析 (1/3 - 3/3) Simulation Modeling and Analysis of Footwear Manufacturing Excellence | 科技部 Ministry of Science and Technology | 2015.08 - 2018.07 | |
製鞋業生產線平衡之研究 (1/3 - 3/3) A Study of Assembly Line Balancing for Footwear Manufacturing Industry | 科技部 Ministry of Science and Technology | 2013.08 - 2016.07 | |
「產業先進設備人才培育計畫」評估指標與成效調查分析 (3/4) The Investigation and Analysis of Performance Indices of 「Talent Fostering Program for Advanced Industry Equipment」 | 教育部 Ministry of Education | 2013.04 - 2014.03 | |
成衣業車縫線生產線平衡之研究 (1/3 - 3/3) A Study of Assembly Line Balancing for Sewing Lines in Apparel Industry | 科技部 Ministry of Science and Technology | 2012.08 - 2015.07 |
主持人 | 計畫名稱 | 贊助單位 | 執行期間 |
陳建良 | 無人搬運車系統規劃與評估 Planning and Analysis of Automated Guided Vehicle Systems | 智易科技 Arcadyan Technology | 2024.06 - 2025.05 |
開發智慧商情銷售預測模型與動態安全庫存調整模型 Development of Smart Business Sales Forecast Model and Dynamic Safety Inventory Adjustment Model | 華新麗華 Walsin | 2024.06 - 2025.11 | |
綠色智造 Green and Smart Manufacturing | 中國砂輪 KINIK | 2024.06 - 2026.05 | |
開發多機協作運載預排程系統技術基礎演算法 Development of a collaborative transportation scheduling system with technical algorithms for heterogeneous multiple autonomous mobile robots | 工業技術研究院 Industrial Technology Research Institute (ITRI) | 2024.04 - 2024.11 | |
智慧商機搜尋 Smart Business Opportunity Search | 中國砂輪 KINIK | 2024.01 - 2025.06 | |
應用深度學習實作多任務學習之急診病患動向與滯留時間預測模型 Applying Deep Learning to Implement Multi-task Learning for Patient Disposition and Length of Stay Prediction in Emergency Department | 馬偕醫院 Mackay Memorial Hospital | 2024.01 - 2024.12 | |
砂輪配方設計系統開發 Development of Formula Design System for Grinding Wheel Spec | 中國砂輪 KINIK | 2023.11 - 2025.04 | |
以精實再造提升生產力 Improving Productivity with Lean Reengineering | 康舒科技 AcBel Technology | 2023.11 - 2024.10 | |
電車線聚合礙子資訊管理系統開發與老化分析應用 Development of Information Management System and Aging Analysis for Train Line Polymer Insulator | 台灣高鐵 Taiwan High Speed Rail | 2023.09 - 2026.09 | |
示範產業供應鏈整合推動 Supply Chain Integration for Benchmarking Industry | 工業技術研究院 Industrial Technology Research Institute (ITRI) | 2023.09 - 2023.11 | |
交管邏輯對不同場域最佳機器人數量分析與模擬驗證 Simulation Study for the Determination of the Number of AGVs with Traffic Control Logic for Different Scenarios | 工業技術研究院 Industrial Technology Research Institute (ITRI) | 2023.05 - 2023.08 | |
應用人工智慧實作急診病患動向與滯留時間預測模型 Applying Artificial Intelligence for Patient Disposition and Length of Stay Prediction in Emergency Department | 馬偕醫院 Mackay Memorial Hospital | 2023.01 - 2023.12 | |
G5 WMA 開線CD BIAS預測 CD Bias Estimation for WMA Equipment at G5 | 友達光電 AUO | 2022.10 - 2023.10 | |
精實智慧製造:智慧儀錶板 Lean and Smart Manufacturing: Intelligent Dashboard | 智易科技 Arcadyan Technology | 2022.11 - 2023.10 | |
智慧型砂輪規格推薦系統研發 Development of Smart Recommendation System for Grinding Wheel Spec | 中國砂輪 KINIK | 2022.10 - 2023.09 | |
訂單履行模組維護 II Order Fulfillment Module Maintenance II | 立錡科技 Richtek Technology | 2022.09 - 2023.04 | |
長短型料號轉換模組維護精進 Maintenance of Conversion Module for Long and Short Material Codes | 立錡科技 Richtek Technology | 2022.09 - 2023.04 | |
韌性供應鏈共通資料蒐集建檔 Common Information Collection and Filing for Supply Chain Resilience | 工業技術研究院 Industrial Technology Research Institute (ITRI) | 2022.09 - 2022.12 | |
客端不良率預測 Increase Prediction Model Accuracy of Defective Rate at Customer Sites to Increase Customer Satisfaction | 友達光電 AUO | 2022.05 - 2023.04 | |
近10年運載系統相關主題文獻探討與分析 Literature Survey and Analysis of Loading System in Recent 10 Years | 工業技術研究院 Industrial Technology Research Institute (ITRI) | 2022.05 - 2022.09 | |
長短型料號轉換模組開發 Development of Conversion Module for Long and Short Material Codes | 立錡科技 Richtek Technology | 2022.04 - 2022.08 | |
精實智慧製造 II Lean Smart Manufacturing II | 智易科技 Arcadyan Technology | 2022.02 - 2024.01 | |
精實管理 II Lean Management II | 中國砂輪 KINIK | 2022.01 - 2023.12 | |
以精實再造消除浪費提升生產力 Productivity Improvement Using Lean Reengineering with Waste Elimination | 中國砂輪 KINIK | 2021.11 - 2022.10 | |
生產規劃流程現況分析與未來軟體需求評估 Analysis of Production Planning Process and Evaluation of Future Software System Requirements | 立錡科技 Richtek Technology | 2021.09 - 2022.08 | |
訂單履行模組優化 Demand Fulfillment Module Optimization | 立錡科技 Richtek Technology | 2021.09 - 2022.08 | |
訂單履行模組維護 Demand Fulfillment Module Maintenance | 立錡科技 Richtek Technology | 2021.08 - 2022.07 | |
SMT 智慧製造 SMT of Smart Manufacturing | 金寶電子 Kinpo Electronics | 2021.06 - 2022.05 | |
智慧製造績效指標架構分析 KPI Analysis for Smart Manufacturing | 金寶電子 Kinpo Electronics | 2021.06 - 2022.05 | |
以精實生產提升競爭力 Improving Competitiveness with Lean Production | 智易科技 Arcadyan Technology | 2021.06 - 2022.05 | |
精實生產與智慧製造 II Lean Production and Smart Manufacturing II | 康舒科技 AcBel Technology | 2021.02 - 2023.09 | |
淡水智慧製造新廠規劃 II Facility Planning for Smart Manufacturing Plant II | 康舒科技 AcBel Technology | 2021.01 - 2022.06 | |
應用人工智慧實作急診住院與回診預測模型 Predicting Emergency Department Admissions and Re-attendance by Artificial Intelligence | 馬偕醫院 Mackay Memorial Hospital | 2021.01 - 2021.12 | |
最終測試產能規劃 Capacity Planning for Final Test | 立錡科技 Richtek Technology | 2020.11 - 2021.10 | |
電車線聚合礙子老化分析暨全線汙染區調查與規劃 Aging Analysis of Train Line Polymer Insulator and Plan and Investigation of Train Line Pollution Areas | 台灣高鐵 Taiwan High Speed Rail | 2020.09 - 2022.08 | |
國內掛號小包分揀流程優化與善用自動化設備研究 Study of Optimization and Automation Application for Domestic Registered Small Package Picking Process | 郵政總局 Post Office | 2020.08 - 2020.11 | |
轉轍器維修管理系統開發與技術服務 Development and Technical Service of Switch Machine Maintenance Management System | 台灣高鐵 Taiwan High Speed Rail | 2020.07 - 2022.06 | |
訂單履行模組開發 Demand Fulfillment Module Development | 立錡科技 Richtek Technology | 2020.07 - 2021.04 | |
應用精實管理提升生產力 Productivity Improvement by Applying Lean Management | 中國砂輪 KINIK | 2020.06 - 2021.05 | |
訂單生產前置時間分析 Order Lead Time Analysis | 立錡科技 Richtek Technology | 2020.03 - 2020.06 | |
無人搬運車(AGV)系統文獻探討與分析 Survey and Analysis of AGVS | 工業技術研究院 Industrial Technology Research Institute (ITRI) | 2020.03 - 2020.06 | |
精實管理 Lean Management | 中國砂輪 KINIK | 2020.01 - 2021.12 | |
智慧預測保養 Smart Predictive Maintenance | Cal-Comp Automation and Industrial 4.0 Service (CCAU), Thailand | 2020.01 - 2020.12 | |
應用機器學習於急診住院預測 Predicting Emergency Department Admissions by Machine Learning | 馬偕醫院 Mackay Memorial Hospital | 2020.01 - 2020.12 | |
以精實再造提升生產力 Productivity Improvement Using Lean Reengineering | 智易科技 Arcadyan Technology | 2019.11 - 2020.10 | |
精實生產與智慧製造 Lean Production and Smart Manufacturing | 康舒科技 AcBel Technology | 2019.11 - 2020.10 | |
淡水智慧製造新廠規劃 Facility Planning for Smart Manufacturing Plant | 康舒科技 AcBel Technology | 2019.09 - 2020.12 | |
精實再造 Lean Reengineering | 智易科技 Arcadyan Technology | 2019.07 - 2020.07 | |
加工中心網頁排程系統研發 (2/2) Development of Web-Based Scheduling System for Machining Center | 群光電能 Chicony Power | 2019.06 - 2020.05 | |
精實智慧化急診室醫師排班系統研究 A Study of Lean and Smart Scheduling for Emergency Department Physicians | 馬偕醫院 Mackay Memorial Hospital | 2019.01 - 2019.12 | |
以精實管理提升生產力 Productivity Improvement Using Lean Management | 智易科技 Arcadyan Technology | 2018.11 - 2019.10 | |
物品取放模式影像實驗設計與資料庫建立 Development of Image Database of Part Access Models with Design of Experiments | 工業技術研究院 Industrial Technology Research Institute (ITRI) | 2018.11 - 2019.10 | |
精實管理 Lean Management | 智易科技 Arcadyan Technology | 2018.07 – 2019.07 | |
加工中心網頁排程系統研發 (1/2) Development of Web-Based Scheduling System for Machining Center | 群光電能 Chicony Power | 2018.06 – 2019.05 | |
精實管理 Lean Management | 光馳科技 OPTORUN | 2018.03 – 2019.02 | |
IoT應用市場調查分析 Market Survey and Analysis of IoT Applications | 群光電能 Chicony Power | 2018.01 – 2018.12 | |
以精實管理改善強度調控放射治療排程 Lean Management to Improve the Scheduling of Intensity-Modulated Radiotherapy | 馬偕醫院 Mackay Memorial Hospital | 2018.01 – 2018.12 | |
精實管理 Lean Management | 群光電能 Chicony Power | 2017.12 – 2019.11 | |
北臺灣郵件作業中心作業流程及產能規劃研究 A Study of Operation Flow and Capacity Planning of Mail Processing Center in North Taiwan | 郵政總局 Post Office | 2017.10 - 2018.02 | |
智慧醫療與熟齡照護 Smart Healthcare and Elderly Care | 群光電能 Chicony Power | 2017.06 – 2018.05 | |
改善強度調控放射治療流程之精實管理及創新模式 Lean Management and Innovation Model for the Improvement of Intensity-Modulated Radiotherapy Treatment Procedure | 馬偕醫院 Mackay Memorial Hospital | 2017.01 – 2017.12 | |
精實管理 Lean Management | 寶成工業 Pou Chen Group | 2016.12 – 2017.12 | |
精實管理與創新 Lean Management and Innovation | 品碩創新管理顧問 | 2016.03 – 2016.10 | |
移動平台運載效率模擬分析 Simulation Analysis of the Loading Efficiency of Moving Platform | 工業技術研究院 Industrial Technology Research Institute (ITRI) | 2016.02 - 2016.06 | |
精實管理 Lean Management | 群光電能 Chicony Power | 2015.12 - 2017.11 | |
運載機器人排程系統軟體模擬 Simulation of Loaded Robot Scheduling | 工業技術研究院 Industrial Technology Research Institute (ITRI) | 2015.10 - 2015.12 | |
精實管理 Lean Management | 寶成工業 Pou Chen Group | 2015.09 - 2016.09 | |
運載管理系統模擬 Simulation of Transportation Management System | 工業技術研究院 Industrial Technology Research Institute (ITRI) | 2015.07 - 2015.08 | |
多車運載系統派工流程規劃與系統模擬 System Simulation of Dispatching for Multiple Vehicle System | 工業技術研究院 Industrial Technology Research Institute (ITRI) | 2015.06 - 2015.11 | |
無人搬運車交通管理程式開發 Development of Traffic Control Code for AGV | 工業技術研究院 Industrial Technology Research Institute (ITRI) | 2015.04 - 2015.07 | |
精實營建 Lean Construction | 聯聚建設 Lien Jade Group | 2015.01 - 2017.06 | |
精實管理 Lean Management | 聯聚貿易 Good Box Group | 2014.08 - 2017.07 | |
卓越製鞋模擬研究 A Simulation Study of Excellent Footwear Manufacturing | 寶成工業 Pou Chen Group | 2014.08 - 2015.07 | |
實驗設計 Design of Experiments | 中強光電 Coretronic | 2014.07 – 2014.08 | |
印尼冷鏈物流市場與產業發展趨勢調查與研究 A Study of the Market and Development of Cold Chain Logistics in Indonesia | 工業技術研究院 Industrial Technology Research Institute (ITRI) | 2014.04 – 2014.11 | |
製造系統自動化及實驗設計 Manufacturing System Automation and Design of Experiments | 中強光電 Coretronic | 2014.02 – 2014.05 | |
精實管理 Lean Management | 中強光電 Coretronic | 2013.09 – 2015.08 | |
精實管理 Lean Management | 揚明光學 Young Optics | 2013.09 – 2015.08 |
1. M. S. Shih, J. C. Chen, T. L. Chen, C. H. Chiang, C. L. Hsu, 2024, Maching-Learning Based Sampling Inspection under OQC Capacity for Real-Time Quality Monitoring in the TFT-LCD Industry, International Journal of Production Research (SCI), http://www.tandfonline.com/doi/full/10.1080/00207543.2024.2395389?src= |
2. M. S. Shih, J. C. Chen, T. L. Chen, C. L. Hsu, 2024, Two-Phase Cost-Sensitive-Learning-Based Framework on Customer-Side Quality Inspection for TFT-LCD Industry, Journal of Intelligent Manufacturing (SCI), https://link.springer.com/article/10.1007/s10845-024-02448-6 |
3. K. C. Yao, T. L. Chen, J. C. Chen, C. R. Lee, 2024, Grinding Wheel Specification Cybernetic Recommendation with Multi-Task Multi-Imbalanced Learning in Smart Manufacturing System, Advanced Engineering Informatics (SCI), Vol. 61, https://www.sciencedirect.com/science/article/pii/S1474034624002131 |
4. J. C. Chen, D. Anggrahini, T. L. Chen, 2024, Current Research and Future Challenges in Parcel Hub towards Logistics 4.0: A Systematic Literature Review from a Decision-Making Perspective, International Journal of Production Research (SCI), https://www.tandfonline.com/doi/full/10.1080/00207543.2024.2337109 |
5. T. L. Chen, J. C. Chen, Y. Y. Chen, Y. J. Chang, 2024, The Optimal Configuration for Various Placement Machines in PCB Assembly Lines, Annals of Operations Research (SCI), https://link.springer.com/article/10.1007/s10479-024-05828-6 |
6. K. F. Ting, J. C. Chen, T. L. Chen, 2024, Effect of Coffee Roasting on the Cupping Quality of Coffee, Coffee Science, Accepted. |
7. J. C. Chen, T. L. Chen, Y. Y. Chen, M. Y. Chung, 2023, Multi-Resource Constrained Scheduling Considering Process Plan Flexibility and Lot Streaming for the CNC Machining Industry, Flexible Services and Manufacturing Journal (SCI), https://link.springer.com/article/10.1007/s10696-023-09514-w |
8. J. C. Chen, T. L. Chen, P. H. Wu, 2023, Truck Scheduling with Fixed Outbound Departures in a Closed-Loop Conveyor System with Shortcuts, Flexible Services and Manufacturing Journal, SCI, https://link.springer.com/article/10.1007/s10696-023-09513-x |
9. J. C. Chen, Y. Y. Chen, T. L. Chen, Y. H. Su, 2023, Applying Modified Adaptive Large Neighborhood Search for Truck Scheduling and Pile Assignment in a Two-stage Sorting System, European Journal of Industrial Engineering, SCI, Accepted. |
10. J. C. Chen, T. L. Chen, P. Peng, T. Lin, W. Z. Huang, 2023, Supply Chain Planning for IC Design House Back-end Production Network with Turnkey Service, IEEE Transactions on Semiconductor Manufacturing, Vol. 36, Issue 3, pp. 458-475. (SCI) |
11. J. C. Chen, T. L. Chen, Y. H. Lee, 2023, Simulation Optimization for Parcel Hub Scheduling Problem in Closed-loop Sortation System with Shortcuts, Simulation Modelling Practice and Theory, Vol. 124, https://www.sciencedirect.com/science/article/pii/S1569190X23000060 (SCI) |
12. J. C. Chen, T. L. Chen, H. L. Wang, P. C. Chen, 2022, Underwater Abnormal Classification System Based on Deep Learning: A Case study on Aquaculture Fish Farm in Taiwan, Aquacultural Engineering, Vol. 99, https://www.sciencedirect.com/science/article/abs/pii/S0144860922000668 (SCI) |
13. T. L. Chen, J. C. Chen, W. H. Chang, W. D. Tsai, M. C. Shih, A. W. Nabila, 2022, Imbalanced Prediction of Emergency Department Admission Using Natural Language Processing and Deep Neural Network, Journal of Biomedical Informatics, Vol. 133, https://www.sciencedirect.com/science/article/pii/S1532046422001824 (SCI) |
14. J. C. Chen, T. L. Chen, P. Peng, T. Lin, H. Y. Hu, 2022, Multi-objective Order Promising for Outsourcing Supply Network of IC Design Houses, IEEE Transactions on Semiconductor Manufacturing, (SCI), Vol. 35, Issue 4, pp. 680-697. |
15. J. C. Chen, Y. Y. Chen, T. L. Chen, Y. H. Lin, 2022, Multi-Project Scheduling with Multi-Skilled Workforce Assignment Considering Uncertainty and Learning Effect for Large-Scale Equipment Manufacturer, Computers & Industrial Engineering, Vol. 169, https://doi.org/10.1016/j.cie.2022.108240 (SCI). |
16. J. C. Chen, H. Y. Lee, W. H. Hsieh, T. L. Chen, 2021, Applying Hybrid Genetic Algorithm to Multi-Mode Resource Constrained Multi-Project Scheduling Problems, Journal of the Chinese Institute of Engineers, Vol. 45, Iss. 1, pp142-53 (SCI). |
17. J. C. Chen, T. L. Chen, W. J. Liu, C. C. Cheng, M. G. Li, 2021, Combining Empirical Mode Decomposition and Deep Recurrent Neural Networks for Predictive Maintenance of Lithium-Ion Battery, Advanced Engineering Informatics, Vol. 50, https://doi.org/10.1016/j.aei.2021.101405 (SCI) |
18. J. C. Chen, Y. Y. Chen, T. L. Chen, Y. C. Yang, 2021, An Adaptive Genetic Algorithm-Based and AND/OR Graph Approach for Disassembly Line Balancing Problem, Engineering Optimization, DOI: 10.1080/0305215X.2021.1957468, (SCI) |
19. P. C. Chang, Y. K. Lin, J. C. Chen, 2021, Reliability Evaluation of Production System with In-Line Stockers, IEEE Transactions on Reliability, Vol. 70, No. 3, pp. 986-995, https://doi.org/10.1109/TR.2020.3033296 (SCI) |
20. J. C. Chen, T. L. Chen, Y. C. Teng, 2020, Meta-model based Simulation Optimization for Automated Guided Vehicle System under Different Charging Mechanisms, Simulation Modelling Practice and Theory, Vol. 106, https://doi.org/10.1016/j.simpat.2020.102208 (SCI) |
21. T. L. Chen, J. C. Chen, C. F. Huang, P. C. Chang, 2020, Solving the Layout Design Problem by Simulation-Optimization Approach—A Case Study on a Sortation Conveyor System, Simulation Modelling Practice and Theory, Vol. 106, https://doi.org/10.1016/j.simpat.2020.102192 (SCI) |
22. J. C. Chen, T. L. Chen, H. C. Hung, 2020, Capacity Allocation with Lot Splitting in Photolithography Area Using Hybrid Genetic Algorithm Based on Self-Tuning Strategy, Computers & Industrial Engineering, Vol. 148, https://doi.org/10.1016/j.cie.2020.106656 (SCI). |
23. W. H. Chang, S. M. Lo, T. L. Chen, J. C. Chen, H. N. Wu, 2020, Utilizing Online Stochastic Optimization on Scheduling of Intensity-Modulate Radiotherapy Therapy (IMRT), Journal of Biomedical Informatics, Vol. 108, https://doi.org/10.1016/j.jbi.2020.103499 (SCI). |
24. J. C. Chen, T. L. Chen, T. C. Ou, Y. H. Lee, 2019, Adaptive Genetic Algorithm for Parcel Hub Scheduling Problem with Shortcuts in Closed-Loop Sortation System, Computers & Industrial Engineering, Vol. 138, https://doi.org/10.1016/j.cie.2019.106114 (SCI). |
25. J. C. Chen, Y. Y. Chen, T. L. Chen, Y. H. Guo, 2019, Applying Two-Phase Adaptive Genetic Algorithm to Solve Multi-Model Assembly Line Balancing Problems in TFT-LCD Module Process, Journal of Manufacturing Systems, Vol. 52, pp. 86 - 99 (SCI). |
26. J. C. Chen, T. L. Chen, B. R. Pratama, Q. F. Tu, 2018, Capacity Planning with Ant Colony Optimization for TFT-LCD Array Manufacturing, Journal of Intelligent Manufacturing, Vol. 29, pp. 1695 - 1713 (SCI). |
27. S. M. Lo, J. C. Chen, T. S. Liu, 2018, Response to Demand Uncertainty of Supply Chains: A Value-Focused Approach with AHP and TOPSIS, International Journal of Industrial Engineering: Theory, Applications and Practice, Vol. 25, No. 5, pp. 739 - 756 (SCI). |
28. J. C. Chen, T. L. Chen, H. Harianto, 2017, Capacity Planning for Packaging Industry, Journal of Manufacturing Systems, Vol. 42, pp. 153 - 169 (SCI). |
29. J. C. Chen, Y. Y. Chen, T. L. Chen, J. Z. Lin, 2017, Comparison of Simulated Annealing and Tabu-Search Algorithms in Advanced Planning and Scheduling System for TFT-LCD Color Filter Fabs, International Journal of Computer Integrated Manufacturing, Vol. 30, No. 6, pp. 516 - 534 (SCI). |
30. N. T. P. Quyen, J. C. Chen, C. L. Yang, 2017, Hybrid Genetic Algorithm to Solve Resource Constrained Assembly Line Balancing Problem in Footwear Manufacturing, Soft Computing, Vol. 21, No. 21, pp. 6279 - 6295 (SCI). |
31. S. M. Lo, H. P. Shen, J. C. Chen, 2017, An Integrated Approach to Project Management Using Kano Model and QFD: An Empirical Case Study, Total Quality Management & Business Excellence, Vol. 28, No. 14, pp. 1584-1608 (SSCI). |
32. P. C. Chang, Y. K. Lin, J. C. Chen, 2017, System Reliability for a Multi-State Manufacturing Network with Joint Buffer Stations, Journal of Manufacturing Systems, Vol. 42, pp. 170 – 178 (SCI). |
33. J. C. Chen, Y. Y. Chen, Y. Liang, 2016, Application of a Genetic Algorithm in Solving the Capacity Allocation Problem with Machine Dedication in the Photolithography Area, Journal of Manufacturing Systems, Vol. 41, pp. 165 - 177 (SCI). |
34. J. C. Chen, T. L. Chen, B. R. Pratama, Q. F. Tu, 2016, Capacity Planning in Thin Film Transistor - Liquid Crystal Display Cell Process, Journal of Manufacturing Systems, Vol. 39, pp. 63 - 78 (SCI). |
35. P. B. Huang, J. C. Chen, C. W. Yu, C. C. Chen, 2016, Integration of Simulation and Neural-Networks in Forecasting the Throughput for TFT-LCD Color Filter Fabs, International Journal of Computer Integrated Manufacturing, Vol. 29, No. 3, pp. 298-308 (SCI). |
36. J. C. Chen, C. J. Sun, T. L. Chen, 2015, Capacity Planning for Integrated Circuit Final Test Plants, International Journal of Computer Integrated Manufacturing, Vol. 28, No. 12, pp. 1262 - 1274 (SCI). |
37. C. W. Wu, J. C. Chen, T. H. Wu, 2015, A Flexible Sampling Scheme for Variables Inspection with Loss Consideration, Journal of Statistical Computation and Simulation, Vol. 85, No. 18, pp. 3766 - 3777 (SCI). |
38. P. C. Chang, Y. K. Lin, J. C. Chen, 2015, A Fuzzy-Based Assessment Procedure for a Clothing Factory with Waste-Prevention Consideration, Journal of Cleaner Production, Vol. 108, pp. 484 - 493 (SCI). |
39. C. W. Wu, M. Aslam, J. C. Chen, C. H. Jun, 2015, A Repetitive Group Sampling Plan by Variables Inspection for Product Acceptance Determination, European Journal of Industrial Engineering, Vol. 9, No. 3, pp. 308 - 326 (SCI). |
40. J. C. Chen, C. H. Cheng, P. T. B. Huang, K. J. Wang, C. J. Huang, T. C. Ting, 2014, Improving Warehouse Operation Efficiency with Lean Production and Radio Frequency Identification Technology, Journal of Quality, Vol. 21, No. 1 (To Appear) (TSSCI, EI). |
41. J. C. Chen, C. W. Wu, T. D. D. Thao, L. H. Su, W. H. Hsieh, T. Y. Chen, Hybrid Genetic Algorithm for Solving Assembly Line Balancing Problem in Footwear Industry, Advanced Materials Research (To Appear) (EI). |
42. J. C. Chen, S. H. Lee, C. Y. Chen, C. C. Chen, T. W. Peng, 2013, Simulation-Based Look-Ahead Release Planning for Color Filter Fabs, Journal of the Society for Information Display, Vol. 21, No. 1, pp. 60 – 70 (SCI, Invited Paper). |
43. J. C. Chen, C. H. Cheng, P. T. B. Huang, K. J. Wang, C. R. Huang, T. C. Ting, 2013, Warehouse Management with Lean and RFID Application: a Case Study, International Journal of Advanced Manufacturing Technology, Vol. 69, pp. 531 - 542 (SCI). |
44. J. C. Chen, P. B. Huang, J. G. Wu, K. Y. Lai, C. C. Chen, 2013, Advanced Planning and Scheduling for TFT-LCD Color Filter Fab with Multiple Lines, International Journal of Advanced Manufacturing Technology, Vol. 67, pp. 101 - 110 (SCI). |
45. J. C. Chen, C. H. Cheng, P. T. B. Huang, 2013, Supply Chain Management with Lean Production and RFID Application: a Case Study, Expert Systems with Applications, Vol. 40, pp. 3389 – 3397 (SCI). |
46. C. W. Wu, C. W. Lin, J. C. Chen, 2013, An Improved Approach for Process Performance Evaluation with the Consideration of Process Yield and Quality Loss, International Journal of Production Research, Vol. 51, No. 21, pp. 6397 – 6409 (SCI). |
47. Y. K. Lin, P. C. Chang, J. C. Chen, 2013, Performance Evaluation for a Footwear Manufacturing System with Multiple Production Lines and Different Station Failure Rates, International Journal of Production Research, Vol. 51, No. 5, pp. 1603 – 1617 (SCI). |
48. Y. F. Hung, C. H. Liang, and J. C. Chen, 2013, Sensitivity Search for Rescheduling of the Semiconductor Photolithography Operations, International Journal of Advanced Manufacturing Technology, Vol. 67, pp. 73 - 84 (SCI). |
49. S. J. Hu, L. H. Su, J. C. Chen, C. Y. Wei, 2013, Innovative Vacuum Cleaner Design Using TRIZ Method, Advanced Materials Research, Vol. 690-693, pp. 3372-3376 (EI). |
1. 陳建良,陳子立,雲聿加,黃羽繪,鄭中強,蔡宗廷,2024,AI 應用於 AGV/AMR 調查研究,機械工業雜誌,497 期,pp. 33 - 43。 |
2. 陳建良,陳子立,戴天吟、邱冰瑩、林宜靜、王俊勝、2023、考量交管邏輯之移載機器人分派研究與數位孿生應用,機械工業雜誌,485 期,pp. 54 - 69。 |
3. 陳建良,陳子立,伍仰輝,鄒家昕,邱冰瑩,韓孟儒,2022,無人搬運車系統最佳車數決定與模擬驗證,機械工業雜誌,473期,pp. 76 - 89。(主編選出最優良文章) |
4. 陳建良,陳子立,2021,產學合作:從精實生產到智慧製造,工業工程雜誌,2021年7月。 |
5. 陳建良,陳子立,蔡萱霓,張郁杰,2020,從精實生產到智慧製造,智慧自動化產業期刊,35期,pp. 34 - 40。 |
6. 陳建良,陳子立,黃唯真,林建銘,2020,AGVS研究調查與最佳車數決定,機械工業雜誌,449期,pp.63 - 71。 |
7. 孫碩彥,陳子立,彭文杰,龍萬德,劉喬溫,陳建良,2015,自動化多車運載用應用於射押出醫材之運載排程模擬,機械工業雜誌,388期,pp. 112 - 123。 |
8. 陳建良,陳俊華,陳子立,林純如,胡譯心,2014,空調產業精實生產,機械工業雜誌, 377期,pp. 95 - 106。 |
9. 張萬珍,陳建良,2013,樂在其中的國際產學之路:陳建良教授,國科會工程科技通訊人物專訪選集2,pp. 79 – 88。 |
10. 陳建良,2012年 3月,人物特寫:100 年度工業工程獎章-產業貢獻類焦點人物-國立台灣科技大學工業管理系陳建良講座教授,中國工業工程學會電子報第五期。 |
1. J. C. Chen, T. L. Chen, Y. C. Yun, Y. H. Huang, T. T. Tsai, C. C. Cheng, Prediction of Path Conflicts in Heterogeneous AGV/AMR Systems, 33rd International Conference on Flexible Automation and Intelligent Manufacturing (FAIM), Taichung, Taiwan, June 23-26, 2024. |
2. J. C. Chen, T. L. Chen, Y. Y. Wang, W. H. Chang, W. D. Tsai, C. H. Yun, J. C. Wang, F. C. Sieh, Appointment Scheduling with Overbooking Considering Patient Unpunctuality and No-Shows, the 11th International Conference on Industrial Engineering and Applications (ICIEA), Hiroshima, Japan, April 17-19, 2024. (Excellent Oral Presentation Award) |
3. T. L. Chen, J. C. Chen, T. Y. Tai, A Simultaneous Scheduling Algorithm for Operation Scheduling and AGV Dispatching, 11th International Conference on Industrial Engineering and Applications (ICIEA), Hiroshima, Japan, April 17-19, 2024. (Excellent Oral Presentation Award) |
4. J. C. Chen, T. L. Chen, Y. C. Kung, Y. J. Lin, S. W. Leu, Y. C. Yun, T. Y. Tai, C. S. Wang, T. T. Tsai, Optimal AGVS Fleet Size and Simulation Verification and Validation, the 11th International Conference on Industrial Engineering and Applications (ICIEA), Hiroshima, Japan, April 17-19, 2024. |
5. J. C. Chen, T. L. Chen, L. W. Huang, K. C. Yao, Enhancing Grinding Wheel Specification Recommendation Through Noise-Reduced Method, the 11th International Conference on Industrial Engineering and Applications (ICIEA), Hiroshima, Japan, April 17-19, 2024. |
6. J. C. Chen, T. L. Chen, T. Y. Yang, Semiconductor Market Demand Forecasting with Leading Indicators, the 11th International Conference on Industrial Engineering and Applications (ICIEA), Hiroshima, Japan, April 17-19, 2024. |
7. J. C. Chen, T. L. Chen, C. H. Chiang, W. H. Chang, W. Tsai, Applying Data Discretization Method in Patient Disposition Prediction in Emergency Department, the 11th International Conference on Industrial Engineering and Applications (ICIEA), Hiroshima, Japan, April 17-19, 2024. |
8. T. L. Chen, J. C. Chen, S.Y. Lee, Self-Adaptive Virtual Sample Generation Mechanism in Virtual Metrology with Small Sample Dataset and Concept Drift, 11th International Conference on Industrial Engineering and Applications (ICIEA), Hiroshima, Japan, April 17-19, 2024. |
9. T. L. Chen, J. C. Chen, C. Y. Wang, Rolling Horizon Supply Chain Capacity Planning for IC Design House Considering Forecast Evolution and Capacity Regret, the 11th International Conference on Industrial Engineering and Applications (ICIEA), Hiroshima, Japan, April 17-19, 2024. |
10. J. C. Chen, T. L. Chen, B. Y. Kew, T. Y. Tai, M. J. Han, Fleet Size Determination of AGVS with Analytical Model and Digital Twin, The 50th International Conference on Computers and Industrial Engineering, Sharjah, UAE, October 30 – November 2, 2023. |
11. J. C. Chen, T. L. Chen, C. L. Hsu, M. S. Shih, S. L. Tseng, Cost-Sensitive-Learning-Based Customer-Side Quality Inspection for TFT-LCD Industry, the 10th International Conference on Industrial Engineering and Applications (ICIEA), Phuket Island, Thailand, April 4-6, 2023. |
12. J. C. Chen, T. L. Chen, B. Y. Kew, M. J. Han, C. S. Wang, Simulation-Based Traffic Control for Multi-AGV System, the 10th International Conference on Industrial Engineering and Applications (ICIEA), Phuket Island, Thailand, April 4-6, 2023. |
13. J. C. Chen, T. L. Chen, C. R. Li, K. C. Yao, T. J. Chen, M. Y. Yang, Constraint-Based Multi-Task Prediction for Grinding Wheel Specification, the 10th International Conference on Industrial Engineering and Applications (ICIEA), Phuket Island, Thailand, April 4-6, 2023. |
14. J. C. Chen, T. L. Chen, C. W. Su, P. Peng, T. Lin, Back-End Production Network Supply Chain Planning for IC Design House with Wafer Level Chip Scale Package, the 10th International Conference on Industrial Engineering and Applications (ICIEA), Phuket Island, Thailand, April 4-6, 2023. |
15. J. C. Chen, T. L. Chen, K. C. Koo, M. G. Li, A Tree-Like Hierarchical KPI Structure for the Manufacturing Process, the 10th International Conference on Industrial Engineering and Applications (ICIEA), Phuket Island, Thailand, April 4-6, 2023. (Excellent Oral Presentation Award) |
16. J. C. Chen, T. L. Chen, P. A. Chou, P. Peng, T. Lin, Rolling Horizon Supply Chain Planning for IC Design House with Forecast Evolution, the 10th International Conference on Industrial Engineering and Applications (ICIEA), Phuket Island, Thailand, April 4-6, 2023. |
17. J. C. Chen, T. L. Chen, M. H. Lee, W. H. Chang, W. Tsai, Multi-Task Learning Model for Patient Disposition and Length of Stay Prediction in Emergency Department, the 10th International Conference on Industrial Engineering and Applications (ICIEA), Phuket Island, Thailand, April 4-6, 2023. |
18. J. C. Chen, T. L. Chen, D. Anggrahini, Increasing Service Level of A Parcel Distribution Center: A Systematic Literature Review, the 10th International Conference on Industrial Engineering and Applications (ICIEA), Phuket Island, Thailand, April 4-6, 2023. |
18. J. C. Chen, T. L. Chen, A. W. Nabila, W. H. Chang, W. Tsai, Neural Network Multi-Class Classification Model for Hospital Disposition Among Different Age Grouping Patients in the Emergency Department, the 10th International Conference on Industrial Engineering and Applications (ICIEA), Phuket Island, Thailand, April 4-6, 2023. |
20. J. C. Chen, T. L. Chen, M. G. Li, K. C. Koo, KPI Analysis and Application, the 13th Annual Industrial Engineering and Operations Management (IEOM) Conference, Manila, Philippines, March 6-9, 2023. |
21. J. C. Chen, T. L. Chen, Y. J. Chang, K. J. Yoe, Y. Chou, Combinatorial Optimization of Various Placement Machines for PCB Assembly Lines, the 7th North American Conference on Industrial Engineering and Operations Management (IEOM 2022), Orlando, Florida, USA. June 12-14, 2022. |
22. J. C. Chen, T. Hsieh, T. Pai, M. H. Lee, C. R. Lee, Y. H. Su, K. C. Koo, The Application of Lean Management to Improve Productivity – A Case Study of Kinik Company, the 7th North American Conference on Industrial Engineering and Operations Management (IEOM 2022), Orlando, Florida, USA. June 12-14, 2022. |
23. A. W. Nabia, M. ER, J. C. Chen, T. L. Chen, The Impact Analysis of Information Technology Alignment for Information Sharing and Supply Chain Integration on Customer Responsiveness, 6th Information Systems International Conference 2021 (ISICO 2021), Indonesia 7-8 August 2021. |
24. J. C. Chen, T. L. Chen, P. H. Wu, H. N. Tsai, Truck Scheduling with Fixed Outbound Departures in a Closed-loop Conveyor System with Shortcuts, The 2020 Annual Meeting of the Operations Research Society of Taiwan (ORSTW 2020), Hsinchu, Taiwan, November 13, 2020. |
25. J. C. Chen, T. L. Chen, W. C. Chang, M. C. Shih, A Novel Data Science Framework for Imbalanced Problem on Prediction of Emergency Department Hospital Admission with a Case Study, The 2020 Annual Meeting of the Operations Research Society of Taiwan (ORSTW 2020), Hsinchu, Taiwan, November 13, 2020. |
26. J. C. Chen, T. L. Chen, T. Nguyen, Y. J. Chang, Lean Production System Design for Cut-to-box Line of Footwear Industry Using Simulation-based Value Stream Mapping, The 2020 Annual Meeting of the Operations Research Society of Taiwan (ORSTW 2020), Hsinchu, Taiwan, November 13, 2020. |
27. J. C. Chen, T. L. Chen, W. J. Liu, C. C. Chiu, C. C. Cheng, M. G. Li, Deep Learning-Based Predictive Maintenance for Lithium-Ion Battery, The 2020 Annual Meeting of the Operations Research Society of Taiwan (ORSTW 2020), Hsinchu, Taiwan, November 13, 2020. |
28. J. C. Chen, T. L. Chen, H. L. Wang, W. C. Chang, Development of Two Phase Deep Learning Model for Underwater Abnormal Grouper Image Classification, the 2nd International Conference on Artificial Intelligence, Software Engineering, Information Technology and Applied Sciences (ASIA), Sydney, Australia, March 14-15, 2020. |
29. J. C. Chen, T. L. Chen, T. C. Ou, P. H. Wu, A Parcel Hub Scheduling Problem on the Automated Sorting System with Shortcuts Solving by Modified Genetic Algorithm, the 2nd International Conference on Artificial Intelligence, Software Engineering, Information Technology and Applied Sciences (ASIA), Sydney, Australia, March 14-15, 2020. |
30. J. C. Chen, T. L. Chen, Y. J. Chen, Y. H. Lin, Capacity Planning for CNC machining Industry, the 2nd International Conference on Artificial Intelligence, Software Engineering, Information Technology and Applied Sciences (ASIA), Sydney, Australia, March 14-15, 2020. |
31. J. C. Chen, T. L. Chen, M. Y. Chung, Y. T, Chiu, Multi-resource Constrained Scheduling Considering Process Plan Flexibility and Lot Streaming for Precision Machining Industry, the 6th International Conference on Industrial Engineering and Applications (ICIEA), Tokyo, Japan, April 12-15, 2019. |
32. J. C. Chen, T. L. Chen, H. Y. Fan, J. Tsai, D. Hsu, and E. J. Wang, Development of Deep Learning Based Underwater Grouper Detection Model for Fish Farming Fields, the 6th International Conference on Industrial Engineering and Applications (ICIEA), Tokyo, Japan, April 12-15, 2019. |
33. J. C. Chen, T. L. Chen, H. L. Wang, J. Tsai, D. Hsu, and E. J. Wang, Using Deep Learning for Image-Based Disease Classification of Epinephelus lanceolatus (Grouper) in High-Density Fish Farm, the 6th International Conference on Industrial Engineering and Applications (ICIEA), Tokyo, Japan, April 12-15, 2019. |
34. T. L. Chen, J. C. Chen, W. H. Chang, Y. J. Chen, H. N. Wu, H. L. Wang, P. J. Chou, Utilizing Online Stochastic Optimization on Scheduling of Intensity-Modulate Radiotherapy Therapy, the 6th International Conference on Industrial Engineering and Applications (ICIEA), Tokyo, Japan, April 12-15, 2019. |
35. J. C. Chen, T. L. Chen, C. F. Huang, Y. H. Lee, Solving a Sortation Conveyor Layout Design Problem with Simulation-optimization Approach, the 6th International Conference on Industrial Engineering and Applications (ICIEA), Tokyo, Japan, April 12-15, 2019. |
36. 陳建良,饒培倫,應用資訊技術於智慧養殖,兩岸清華學術研討會,新竹市國立清華大學,December 13-16, 2018 |
37. J. C. Chen, T. L. Chen, W. T. Wang, W. L. Hu, J. E. S. Avellan, Risk-Controlled Simultaneous Scheduling of Machines and AGVs Using a Quantile-based Optimization Approach, 2018 International Symposium on Business and Management (ISBM 2018), Osaka, Japan, April 1 -3, 2018. |
38. J. C. Chen, T. L. Chen, W. H. Chang, Y. J. Chen, T. Y. Chu, Decision Making in Healthcare Industry, 2018 International Symposium on Business and Management (ISBM 2018), Osaka, Japan, April 1 -3, 2018. |
39. M. B. Lin, T. L. Chen, J. C. Chen, Y. J. Chen, Solving a Quantile-Based Stochastic Resource Allocation Problem with Simulation-Optimization Method, 2018 International Symposium on Business and Management (ISBM 2018), Osaka, Japan, April 1 -3, 2018. (Distinguished Paper Award) |
40. T. L. Chen, J. C. Chen, H. C. Hung, T. C. Ou, Solving the Loading Balance Problem in the Photolithography Area, 2018 International Symposium on Business and Management (ISBM 2018), Osaka, Japan, April 1 -3, 2018. |
41. Y. Y. Chen, J. C. Chen, Y. C. Yang, C. F. Huang, Applying Adaptive Genetic Algorithm and AND/OR Graph to Disassembly Line Balancing Problems, 2018 International Symposium on Business and Management (ISBM 2018), Osaka, Japan, April 1 -3, 2018. |
42. Y. Y. Chen, J. C. Chen, Y. H. Kuo, H. N. Wu, A Study of Multi-Model Assembly Line Balancing Problem for TFT-LCD Module Process, 2018 International Symposium on Business and Management (ISBM 2018), Osaka, Japan, April 1 -3, 2018. |
43. J. C. Chen, W. T. Wang, M. B. Lin, T. L. Chen, A Three-phase Optimization Method for Quantile-based Stochastic Resource Allocation Problems, International Conference on Advanced Technology Innovation 2017 (ICATI2017), Samui, Thailand, June 25 - 28, 2017. |
44. J. C. Chen, Y. Y. Chen, Y. H. Kuo, Improved Genetic Algorithm to Solve Multi-Model Assembly Line Balancing Problem in TFT-LCD Module Process, International Conference on Advanced Technology Innovation 2017 (ICATI2017), Samui, Thailand, June 25 - 28, 2017. |
45. T. L. Chen, J. C. Chen, W. H. Chang, Y. J. Chen, Y. Y. Feng, D. L. Wang, T. Y. Chu, Combine Quick Changeover Technique with Other Lean Methods for Lean Healthcare Management, International Conference on Advanced Technology Innovation 2017 (ICATI2017), Samui, Thailand, June 25 - 28, 2017. |
46. T. L. Chen, J. C. Chen, W. L. Hu, Solving a Simultaneous Scheduling Problem with a Quantile-Based Optimization Approach, International Conference on Advanced Technology Innovation 2017 (ICATI2017), Samui, Thailand, June 25 - 28, 2017. |
47. Y. Y. Chen, J. C. Chen, Y. C. Yang, Two Stage Genetic Algorithm for Disassembly Line Balancing Problems with Task Precedence Diagram Constructing Using an AND/OR Graph, International Conference on Advanced Technology Innovation 2017 (ICATI2017), Samui, Thailand, June 25 - 28, 2017. |
48. Y. Y. Chen, J. C. Chen, H. C. Hung, Using Two-Stage Genetic Algorithm for Load Balancing among Photolithography Machines with Variable Order Splitting Restriction, International Conference on Advanced Technology Innovation 2017 (ICATI2017), Samui, Thailand, June 25 - 28, 2017. |
49. T. P. Q. Nguyen, R. J. Kuo, J. C. Chen and C. L. Yang, Dynamic Programming to Solve Resource Constrained Assembly Line Balancing Problem in Footwear Manufacturing, 4th International Conference on Industrial Engineering and Applications (IEA), April 21-23, 2017. |
50. T. Du, J. C. Chen, P. T. Huang, Y. H. Peng, Multi-CONWIP for Order Release and WIP Control in Color Filter Fabs, Western Decision Sciences Institute Annual Meeting, Vancouver, BC, Canada, April 4 - 8, 2017. |
51. J. C. Chen, T. L. Chen, W. C. Peng, Y. C. Teng, C. Y. Kuo, Y. S. Sun, Simulation Modeling and Analysis of AGV Transportation System in Medical Appliances Manufacturing Plant, the 16th Asia Pacific Industrial Engineering & Management Systems (APIEMS) Conference, Ho Chi Minh City, Vietnam, December 08 - 11, 2015. |
52. J. C. Chen, T. L. Chen, Y. S. Su, Y. C. Chang, Simulation Modeling and Analysis for Footwear Stitching Lines, the 16th Asia Pacific Industrial Engineering & Management Systems (APIEMS) Conference, Ho Chi Minh City, Vietnam, December 08 - 11, 2015. |
53. T. L. Chen, S. M. Lo, J. C. Chen, N. A. Arifin, H. Harianto, The Integrated Production-Inventory- Distribution Planning in Asia Supply Chain, the 16th Asia Pacific Industrial Engineering & Management Systems (APIEMS) Conference, Ho Chi Minh City, Vietnam, December 08 - 11, 2015. |
54. T. L. Chen, J. C. Chen, W. C. Peng, P. H. Chiu, C. Y. Kuo, Y. S. Sun, Design and Analysis of Automated Guided Vehicle System under Single-Loop and Bi-Directional Layouts, the 16th Asia Pacific Industrial Engineering & Management Systems (APIEMS) Conference, Ho Chi Minh City, Vietnam, December 08 - 11, 2015. |
55. Y. Y. Chen, J. C. Chen, Y. H. Hu, Q. Hua, Apply Grouping Genetic Algorithm to Develop an Assembly Line Balancing System for Apparel Industry, the 16th Asia Pacific Industrial Engineering & Management Systems (APIEMS) Conference, Ho Chi Minh City, Vietnam, December 08 - 11, 2015. |
56. Y. Y. Chen, J. C. Chen, C. Y. Lin, Y. X. Lin, A Genetic Algorithm for Type-E Assembly Line Balancing Problem in Footwear Industry, the 16th Asia Pacific Industrial Engineering & Management Systems (APIEMS) Conference, Ho Chi Minh City, Vietnam, December 08 - 11, 2015. |
57. Y. Y. Chen, J. C. Chen, C. J. Lin, H. Y. Shih, Type-III Assembly Line Balancing Problem in Footwear Industry, the 16th Asia Pacific Industrial Engineering & Management Systems (APIEMS) Conference, Ho Chi Minh City, Vietnam, December 08 - 11, 2015. |
58. 陳建良,陳子立,孫彥碩,彭文杰,彭郁惠,邱佩秀,AGV搬運系統分析與規劃-以醫療器材製造為例,中國工業工程學會103年度年會暨學術研討會,台北,December, 2014。 |
59. 陳建良,陳慧娟,洪筠緯,施欣妤,娜迪雅,李納迪,印尼冷鏈物流市場與產業發展趨勢之分析,中國工業工程學會103年度年會暨學術研討會,台北,December, 2014。 |
60. J. C. Chen, T. L. Chen, K. Chen, A. Hung, C. J. Lin, Application of Value Stream Mapping for Lean Management: A Case Study of Air Conditioner Production Line, the 15th Asia Pacific Industrial Engineering & Management Systems (APIEMS) Conference, Jiju, Korea, October 12 - 15, 2014. |
61. J. C. Chen, T. L. Chen, K. Chen, A. Hung, Y. Liang, C. J. Lin, Lean Production in Automotive Parts Industry-A Case Study, the 15th Asia Pacific Industrial Engineering & Management Systems (APIEMS) Conference, Jiju, Korea, October 12 - 15, 2014. |
62. J. C. Chen, T. L. Chen, C. Y. Lin, C. J. Lin, A Genetic Algorithm for Solving Assembly Line Balancing Problem in Footwear Stitching Line, the 15th Asia Pacific Industrial Engineering & Management Systems (APIEMS) Conference, Jiju, Korea, October 12 - 15, 2014. |
63. J. C. Chen, T. L. Chen, Y. J. Lin, C. J. Lin, Y. H. Hu, Assembly Line Type II Problem of Sewing Lines in Garment Industry, the 15th Asia Pacific Industrial Engineering & Management Systems (APIEMS) Conference, Jiju, Korea, October 12 - 15, 2014. |
64. J. C. Chen, X. M. Huang, Y. H. Peng, Statistical Analysis for Characterizing the Tensile Stress of Concrete, the 15th Asia Pacific Industrial Engineering & Management Systems (APIEMS) Conference, Jiju, Korea, October 12 - 15, 2014. |
65. J. C. Chen, J. Chen, Y. W. Hung, M. R. Darmawan, N. A. Arifin, H. Y. Shih, Cold Chain Logistics Development: Analyzing Taiwan Influences in Indonesia Market, the 15th Asia Pacific Industrial Engineering & Management Systems (APIEMS) Conference, Jiju, Korea, October 12 - 15, 2014. |
66. J. C. Chen, Industrial Engineering Education and Application in Taiwan, The 4th International Conference on Industrial Engineering and Operations Management, Bali, Indonesia, January 7-9, 2014. (Distinguished Educator Award) |
67. J. C. Chen, C. C. Chen, Y. J. Lin, C. J. Lin, T. Chen, Assembly Line Balancing Problem of Sewing Lines in Garment Industry, The 4th International Conference on Industrial Engineering and Operations Management, Bali, Indonesia, January 7-9, 2014. (Best Track Papers Award) |
68. J. C. Chen, N. Anggono, A. P. Putra, R. Chou, E. S. Chang, Simulation Modeling and Analysis of Line Length and Batch Size in Footwear Factory, The 4th International Conference on Industrial Engineering and Operations Management, Bali, Indonesia, January 7-9, 2014. (Outstanding Student Award) |
69. J. C. Chen, A. P. Putra, N. Anggono, J. Chen, Y. S. Su, Simulation Modeling and Analysis for Stitching Line of Footwear Industry, The 4th International Conference on Industrial Engineering and Operations Management, Bali, Indonesia, January 7-9, 2014. |
70. J. C. Chen, I. Baihaqi, N. A. Arifin,Two Step Approach of Structural Equation Modeling in Supply Chain Practices, The 4th International Conference on Industrial Engineering and Operations Management, Bali, Indonesia, January 7-9, 2014. |
71. J. C. Chen, A. M. Chiu, Excess and Obsolete Raw Materials Depletion through Reworks: A Case Study in Wastes Minimization, The 4th International Conference on Industrial Engineering and Operations Management, Bali, Indonesia, January 7-9, 2014. |
72. J. C. Chen, C. C. Chen, Y. Y. Wei, C. P. Liu, J. Z. Lin, Application of Simulated Annealing Algorithm in Advanced Planning and Scheduling System for TFT-LCD Color Filter Fab, The 4th International Conference on Industrial Engineering and Operations Management, Bali, Indonesia, January 7-9, 2014. |
73. J. C. Chen, T. C. Shen, C. P. Fun, J. W. H. Chang, T. Y. Chang, Z. S. Lin, and Y. J. Lin, A Study of Incentives and its Policies for Sustainability in Supply Chain, The 4th International Conference on Industrial Engineering and Operations Management, Bali, Indonesia, January 7-9, 2014. |